Metro line in Chengdu, China
4 ft 8+1⁄2 in)
Chengdu Metro Line 27 (Chinese: 成都地铁27号线) is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue.
On 21 August 2019, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27.
The first phase will be from Xindu District Shifo station to Qingyang District Shuxin Road station. The line is 24.86km long with 23 stations. From the north, the line has a 7.52km long elevated section with 6 stations, followed by a 17.34km underground section with 17 stations. Phase 1 started construction on 2020-5-18, and is planned to open by 2024.[1][2]
Progress
- On 17 June 2019, the NDRC approved the fourth phase expansion for the Chengdu Metro. It consists of Line 8 Phase 2, Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, Line 19 Phase 2, Line 27 Phase 1, Line 30 Phase 1.[3] The Fourth Phase consists of 176.65 km (109.77 mi) of new lines.[citation needed]
- On 18 March 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[4]
- On 18 May 2020,Line 8 Phase 2, Line 27 Phase 1, Line 30 Phase 1 started construction. This marks the date all 4th Phase projects started construction.[5]
- On 21 March 2023, Line 27 finished all station construction.[6]
Stations
There are 7.52km that are on ground with 6 stations; and a 17.34km underground tunnel with 17 stations. Phase 1 has 9 interchange stations[7]
Phase | Tentative station name | Station Type | Transfer | District |
English | Chinese | Alignment | Platform Configuration |
|
Phase 1 | Shifo | 石佛 | Elevated | Island | | Xindu |
Ciyi | 慈义 | |
Xingcheng Avenue | 兴城大道 | |
Zhantansi | 旃檀寺 | |
Shimenkan | 石门坎 | | Jinniu |
Sanshengsi | 三圣寺 | |
Fanjia Alley | 范家巷 | Underground | |
Liyuwan | 鲤鱼湾 | |
Bairendian | 白仁店 | |
Laijiadian | 赖家店 | 9 |
Weijianian | 韦家碾 | 1 |
Shuzu Road | 蜀祖路 | 18 | Chenghua |
Wangjiaqiao | 王贾桥 | | Jinniu |
Dongzikou | 洞子口 | 5 |
Shaheyuan | 沙河源 | |
Xinqiao | 新桥 | |
Jinfu | 金府 | 6 |
Huazhaobi North | 花照壁北 | |
Jinniu Park | 金牛公园 | 12 |
Yangxi Flyover | 羊犀立交 | 2 |
Huangzhong | 黄忠 | |
Jinsha Riverside Park | 金沙滨河公园 | | Qingyang |
Shuxin Road | 蜀鑫路 | |
|
References
- ^ "成都市轨道交通(2019-2035)最新规划之地铁27号线最全解析篇" (in Chinese). 2020-06-08.
- ^ "@成都城北市民:地铁27号线(一期)全线打围施工_四川在线". sichuan.scol.com.cn (in Chinese). Retrieved 2021-03-13.
- ^ "国家发展改革委关于成都市城市轨道交通第四期建设规划(2019-2024年)的批复" (in Chinese). 2019-06-17. Retrieved 2019-08-21.
- ^ "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn (in Chinese). Retrieved 2020-06-14.
- ^ "成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工" [Phase II of Chengdu Metro Line 8, Phase I of Line 27, and Phase I of Line 30 have started, and construction planning for the fourth phase of rail transit has all started]. sichuan.scol.com.cn (in Chinese).}
- ^ "成都地铁27号线一期全线车站主体结构顺利封顶" (in Chinese).
- ^ 成都轨道交通集团有限公司 (2020-03-24). "成都轨道交通27号线一期工程环境影响报告书征求意见稿公开" (PDF) (in Chinese).
Public transportation in Sichuan Province (SC)
Chengdu Metro | Lines in operation | - 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 17
- 18
- 19
|
---|
Under construction | - 8 (phase II)
- 10 (phase III)
- 13
- 17 (phase II)
- 18 (phase III)
- 27
- 30
- S3
- S5
- S11
|
---|
Planned | - 5 (phase III)
- 9 (phase II)
- 10 (phase IV)
- 12
- 16
- 18 (phase IV)
- 20
- 22
- 23
- 27 (phase II)
|
---|
|
---|
Guang'an Metro | Under construction | |
---|
Planned | |
---|
|
---|
Yibin ART | Lines in operation | |
---|
Under construction | |
---|
|
---|
C-train | |
---|
Intercity rails | |
---|
Chengdu Trams | Lines in operation | |
---|
Under construction | |
---|
Under planning | |
---|
|
---|
Other rail transits | |
---|
Chengdu BRT | Lines in operation | - Line K1 / Line K1A (clockwise)
- Line K2 / Line K2A (anticlockwise)
- Line K3
- Line K5
- Line K11
- Line K12
- Line K13
- Line K16
|
---|
|
---|
Transportation hubs | Int'l airports | |
---|
Railway stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|