Asrama Haji LRT station
2°55′10.4″S 104°42′42.6″E / 2.919556°S 104.711833°E / -2.919556; 104.711833Owned by Indonesian Railway Company Operated by Indonesian Railway Company Line(s) Line 1 Platforms 2 side platforms Tracks 2 Construction Structure type Elevated Parking none Bicycle facilities none Accessible Available Other information Station code ASH History Opened 7 September 2018 (2018-09-07)[1] Services
Preceding station | Palembang LRT | Following station | ||
---|---|---|---|---|
SMB II Terminus | Line 1 | Punti Kayu towards DJKA |
Location | |
---|---|
P02 Asrama Haji Location in Palembang |
Asrama Haji Station is a station of the Palembang LRT Line 1. The station began operations on 7 September 2018, after the 2018 Asian Games had concluded.[2]
Nearby the station is Palembang Hajj Dormitory (Asrama Haji Palembang), hence its name.
Station layout
2F Platforms | Side platform, doors will open on the right | |
Platform 1 | LRT Line 1 towards DJKA → | |
Platform 2 | ← LRT Line 1 towards SMB II | |
Side platform, doors will open on the right | ||
1F | Concourse | Faregates, Ticket Booths, Station Control, Shops, Musalla |
G | Street Level | Parking (plan) |
References
- v
- t
- e
Railway stations in Indonesia
Aceh | |
---|---|
|
|
|
|
|
|
|
|
|
|
|
|
This Indonesian railroad station-related article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e